The Tunnel
by ARCHONODE

PHASE II← Back to PHASE II index
Lore
The Tunnel. The work has a direction. The Tunnel is the path through the project — the long stretch where you can't see the end, only the walls and the next step.
// ACCESS THE SIGNAL
// SHARE